Connection to the electricity network
Get information about connection to the electricity network, required documents, service fee and connection time, installation of electricity meter here
Connection to the electricity network
  • CategoryElectricity

Application for connection of construction facilities to the electricity network

Consumers belonging to the household group can apply for the supply of electricity (capacity) to existing or future construction facilities through "ASAN service", "ASAN Utility" and SME house or e-government portal.


List of required documents

  • ID cards;
  • Document confirming ownership (Registration card, extract on state registration of property rights (together with technical passport or plan-scheme);
  • Document on required power capacity and quality indicators (cargo report)

For detailed information on connecting construction sites to the electricity network, please visit this link.


Service fee and connection period

It is determined by the decision of the Cabinet of Ministers of the Republic of Azerbaijan No. 327 dated July 24, 2018.

Connection is made within 12 or 24 days, depending on the payment.


Installation of electricity meter

Provision of household consumers with electricity meters is supplied, installed and replaced at the expense of the energy supply company. 

Given that general technical conditions are provided for connection of residential buildings to the power supply network and the requirements of these technical conditions are met, separate technical conditions, project documents and connection fee are not required for connection of apartments located in these buildings to the power supply network.